
Refrigeration System Design
Dairy [200+], Greenfield Facilities [80+], Ice, Drink & Beverage [70+], Refrigeration [70+]A national juice and dairy processor commissioned CEITM to develop a central ammonia refrigeration system performance design for a new cold storage facility (+34 ºF) and future freezer (-10 ºF). The challenge in this project was that the client…

Foreign Material Investigation
Dairy [200+], Retrofit Projects [400+]A large international food processing company received packaged cheese products from a small dairy processor in Nevada and claimed that the product was contaminated with foreign material in the form of small pieces of plastic during production.…

Whey Process Expansion
Dairy [200+], Mechanical [30+], Retrofit Projects [400+]An existing dairy processing plant in the Midwest contracted CEI™ to provide the preliminary and final process engineering design to expand the capacity of the existing dairy production facility by several million pounds of milk per day for…

Extended Shelf Life Milk Filler
Dairy [200+], Mechanical [30+], Retrofit Projects [400+]CEI™ provided process and packaging engineering services for the design, procurement and installation of a new Extended Shelf Life Filler in an existing milk plant with a total project budget of ~ $3.5MM. This required detailed design work…

Dairy Pilot Plant
Dairy [200+], Greenfield Facilities [80+], Mechanical [30+], Refrigeration [70+]CEITM provided engineering services to aid in the development and installation of a major food processor’s pilot plant. This testing facility included a whey dryer, an HTST, NF/RO membrane systems, tanks, pumps, and other peripheral equipment…