Covert Engineers, Inc.
  • Home
  • What We Do
  • Portfolio
  • Careers
  • Testimonials
  • Contact Us
  • Menu Menu

Refrigeration System Design

Dairy [200+], Greenfield Facilities [80+], Ice, Drink & Beverage [70+], Refrigeration [70+]
A national juice and dairy processor commissioned CEITM to develop a central ammonia refrigeration system performance design for a new cold storage facility (+34 ºF) and future freezer (-10 ºF). The challenge in this project was that the client…
October 11, 2019
https://covertengineers.com/wp-content/uploads/2019/10/refrigeration-system.jpg 683 1024 Carter /wp-content/uploads/2017/07/cei-logo-tm.png Carter2019-10-11 21:16:552022-08-18 17:47:58Refrigeration System Design

Foreign Material Investigation

Dairy [200+], Retrofit Projects [400+]
A large international food processing company received packaged cheese products from a small dairy processor in Nevada and claimed that the product was contaminated with foreign material in the form of small pieces of plastic during production.…
June 12, 2019
https://covertengineers.com/wp-content/uploads/2019/06/1366-MEKH-1.jpg 1597 2000 Covert Engineers, Inc. /wp-content/uploads/2017/07/cei-logo-tm.png Covert Engineers, Inc.2019-06-12 19:10:542022-08-18 17:47:59Foreign Material Investigation

Whey Process Expansion

Dairy [200+], Mechanical [30+], Retrofit Projects [400+]
An existing dairy processing plant in the Midwest contracted CEI™ to provide the preliminary and final process engineering design to expand the capacity of the existing dairy production facility by several million pounds of milk per day for…
June 12, 2019
https://covertengineers.com/wp-content/uploads/2019/06/whey.jpg 576 1049 Covert Engineers, Inc. /wp-content/uploads/2017/07/cei-logo-tm.png Covert Engineers, Inc.2019-06-12 18:28:222022-08-18 17:47:59Whey Process Expansion

Extended Shelf Life Milk Filler

Dairy [200+], Mechanical [30+], Retrofit Projects [400+]
CEI™ provided process and packaging engineering services for the design, procurement and installation of a new Extended Shelf Life Filler in an existing milk plant with a total project budget of ~ $3.5MM.  This required detailed design work…
August 9, 2017
https://covertengineers.com/wp-content/uploads/2017/07/Extended-Shelf-Life-Milk-Filler-Project-Profile.jpg 2100 1575 Covert Engineers, Inc. /wp-content/uploads/2017/07/cei-logo-tm.png Covert Engineers, Inc.2017-08-09 17:13:272022-08-18 17:47:59Extended Shelf Life Milk Filler

Dairy Pilot Plant

Dairy [200+], Greenfield Facilities [80+], Mechanical [30+], Refrigeration [70+]
CEITM provided engineering services to aid in the development and installation of a major food processor’s pilot plant. This testing facility included a whey dryer, an HTST, NF/RO membrane systems, tanks, pumps, and other peripheral equipment…
August 9, 2017
https://covertengineers.com/wp-content/uploads/2016/07/Project-Cost-Control.jpg 1667 2500 Covert Engineers, Inc. /wp-content/uploads/2017/07/cei-logo-tm.png Covert Engineers, Inc.2017-08-09 17:10:132022-08-18 17:47:59Dairy Pilot Plant
Search Search

Latest Projects

  • Refrigeration System DesignOctober 11, 2019 - 9:16 pm
  • Crinkle Cut French Fries (3D Design)October 11, 2019 - 9:13 pm
  • Fruit Processing Facility RelocationOctober 11, 2019 - 9:11 pm
  • Greenfield DistilleryJune 12, 2019 - 8:30 pm

1400+

Total Projects


Browse selected sample project profiles below.

Categories

© Copyrght Covert Engineers, Inc.| Made with ♥ by Strategy Lab
  • Home
  • What We Do
  • Portfolio
  • Careers
  • Testimonials
  • Contact Us
Scroll to top Scroll to top Scroll to top