Crinkle Cut French Fries (3D Design)
Fruit & Vegetables [400+], Mechanical [30+], Retrofit Projects [400+]CEITM was contracted by a large international vegetable processor to provide complete engineering services including design, procurement, project management, installation oversight and startup/commissioning services for a new Crinkle Cut French…
![](https://covertengineers.com/wp-content/uploads/2019/10/fruit-process-relocation-495x400.jpg)
Fruit Processing Facility Relocation
Fruit & Vegetables [400+], Mechanical [30+], Retrofit Projects [400+]CEITM was contracted by an Oregon fruit processor to develop general arrangement/layout drawings for five existing process lines (food service, aseptic, canning, compote, and FIH) to be relocated to a newly purchased existing facility.
The…
![](https://covertengineers.com/wp-content/uploads/2019/06/ammonia-piping-495x400.jpg)
Ammonia Piping Failure Analysis
Fruit & Vegetables [400+], Refrigeration [70+], Retrofit Projects [400+]
An international food processing company observed corrosion of their aging High-Pressure Liquid ammonia piping on a long run from the engine room to the processing plant so CEITM was hired to perform an engineering analysis and calculations…
![](https://covertengineers.com/wp-content/uploads/2019/06/1366-MEKH-1-495x400.jpg)
Foreign Material Investigation
Dairy [200+], Retrofit Projects [400+]A large international food processing company received packaged cheese products from a small dairy processor in Nevada and claimed that the product was contaminated with foreign material in the form of small pieces of plastic during production.…
![](https://covertengineers.com/wp-content/uploads/2019/06/1359-BPB-495x400.jpg)
Chicory Processing
Fruit & Vegetables [400+], Mechanical [30+], Retrofit Projects [400+]CEITM was initially commissioned in 2017 to provide expedited final design and startup of a portion of a new chicory root processing line in Gering, Nebraska. The initial effort was a very fast paced emergency engineering effort to provide process…
![](https://covertengineers.com/wp-content/uploads/2019/06/whey-495x400.jpg)
Whey Process Expansion
Dairy [200+], Mechanical [30+], Retrofit Projects [400+]An existing dairy processing plant in the Midwest contracted CEI™ to provide the preliminary and final process engineering design to expand the capacity of the existing dairy production facility by several million pounds of milk per day for…
![](https://covertengineers.com/wp-content/uploads/2018/01/Cans-1-495x400.jpg)
Fully Automated Canning Line
Canning, Retort, UHT & Aseptic [10+], Mechanical [30+], Retrofit Projects [400+]CEITM provided engineering services for the design and installation of a fully automated retort line for packaging of canned products. This automated design was fully comprehensive starting with empty cans and aseptic product, and ending with…
![](https://covertengineers.com/wp-content/uploads/2017/07/plant-design-and-scope.jpg)
Seafood Facility SQF Renovation
Mechanical [30+], Retrofit Projects [400+], Seafood [40+]CEITM provided plant design and scope development services to incorporate SQF requirements into a seafood processing facility renovation project. The specified plant design created the necessary distinct production zones with physical separation,…
![](https://covertengineers.com/wp-content/uploads/2017/07/Jerky-Project-Profile-495x400.jpg)
Jerky Processor
Meats & Poultry [20+], Mechanical [30+], Retrofit Projects [400+]CEITM provided a broad spectrum of services to this meat jerky processor from engineering design to project management assistance in order to fully upgrade an existing processing line to a newer, more automated and efficient process. CEITM…
![](https://covertengineers.com/wp-content/uploads/2017/07/Extended-Shelf-Life-Milk-Filler-Project-Profile-495x400.jpg)
Extended Shelf Life Milk Filler
Dairy [200+], Mechanical [30+], Retrofit Projects [400+]CEI™ provided process and packaging engineering services for the design, procurement and installation of a new Extended Shelf Life Filler in an existing milk plant with a total project budget of ~ $3.5MM. This required detailed design work…