Refrigeration System Design

, , ,
A national juice and dairy processor commissioned CEITM to develop a central ammonia refrigeration system performance design for a new cold storage facility (+34 ºF) and future freezer (-10 ºF). The challenge in this project was that the client…

Greenfield Distillery

, , ,
Covert Engineers, Inc. was hired by a design-build contractor to provide the utility and process design for a new, brownfield distillery project in Portland, OR including milling, mashing, fermenting, stills, tank storage, blending, maturation…

Ammonia Piping Failure Analysis

, ,
An international food processing company observed corrosion of their aging High-Pressure Liquid ammonia piping on a long run from the engine room to the processing plant so CEITM was hired to perform an engineering analysis and calculations…

Cold Storage Underfloor Heating

,
CEITM was hired by a freezer construction contractor to provide engineering services in support of a new cold storage building being built in Washington State. CEI’s scope of work included design details for the under-slab glycol heating system…

Greenfield Potato Processing Plant

, , ,
Greenfield Potato Processing Plant In 2016 CEITM was selected as part of the design team for a new, state of the art, greenfield potato processing plant.  The total project budget was $250MM and included a 250,000 sq.ft. processing building,…

Dairy Pilot Plant

, , ,
CEITM provided engineering services to aid in the development and installation of a major food processor’s pilot plant. This testing facility included a whey dryer, an HTST, NF/RO membrane systems, tanks, pumps, and other peripheral equipment…

White Wine Energy and Utilities

, , , ,
CEI™ was requested to assist with process support utility engineering for a new white wine production facility in Oregon.  The goal was to review, from an engineering basis, certain utility loads for the new white wine facility based on a…

Greenfield Brewery

, , ,
CEITM provided process and utility engineering services for the analysis, design, and specification of equipment necessary for the installation of a New 92BBL Cast Out Brew House.  This project required a full set of block flow/mass balance…

Stillhouse Expansion, Energy and Utilities

, , , ,
A Distillery decided to move their existing distillation operation to a new location in Portland, OR while also expanding capacity by adding a new whisky still and brewhouse system.  CEITM was engaged by a design-build contractor to provide…