An existing dairy processing plant in the Midwest contracted CEI™ to provide the preliminary and final process engineering design to expand the capacity of the existing dairy production facility by several million pounds of milk per day for…
https://covertengineers.com/wp-content/uploads/2019/06/whey.jpg5761049Covert Engineers, Inc./wp-content/uploads/2017/07/cei-logo-tm.pngCovert Engineers, Inc.2019-06-12 18:28:222022-08-18 17:47:59Whey Process Expansion
CEITM provided engineering services for the design and installation of a fully automated retort line for packaging of canned products. This automated design was fully comprehensive starting with empty cans and aseptic product, and ending with…
https://covertengineers.com/wp-content/uploads/2018/01/Cans-1.jpg7441000Covert Engineers, Inc./wp-content/uploads/2017/07/cei-logo-tm.pngCovert Engineers, Inc.2018-01-10 00:14:172022-08-18 17:47:59Fully Automated Canning Line
Greenfield Potato Processing Plant
In 2016 CEITM was selected as part of the design team for a new, state of the art, greenfield potato processing plant. The total project budget was $250MM and included a 250,000 sq.ft. processing building,…
CEITM provided plant design and scope development services to incorporate SQF requirements into a seafood processing facility renovation project. The specified plant design created the necessary distinct production zones with physical separation,…
CEITM provided a broad spectrum of services to this meat jerky processor from engineering design to project management assistance in order to fully upgrade an existing processing line to a newer, more automated and efficient process. CEITM…
CEI™ provided process and packaging engineering services for the design, procurement and installation of a new Extended Shelf Life Filler in an existing milk plant with a total project budget of ~ $3.5MM. This required detailed design work…
CEITM provided process and utility engineering services for the analysis, design, and specification of equipment necessary to double the production capacity of a 30BBL brew house. This required an energy and mass balance of the production…
https://covertengineers.com/wp-content/uploads/2017/07/Brewing-Project-Profile.jpg21001575Covert Engineers, Inc./wp-content/uploads/2017/07/cei-logo-tm.pngCovert Engineers, Inc.2017-08-09 17:11:442022-08-18 17:47:59Brew House and Boiler Room
CEITM provided engineering services to aid in the development and installation of a major food processor’s pilot plant. This testing facility included a whey dryer, an HTST, NF/RO membrane systems, tanks, pumps, and other peripheral equipment…
https://covertengineers.com/wp-content/uploads/2016/07/Project-Cost-Control.jpg16672500Covert Engineers, Inc./wp-content/uploads/2017/07/cei-logo-tm.pngCovert Engineers, Inc.2017-08-09 17:10:132022-08-18 17:47:59Dairy Pilot Plant
CEI™ was requested to assist with process support utility engineering for a new white wine production facility in Oregon. The goal was to review, from an engineering basis, certain utility loads for the new white wine facility based on a…
https://covertengineers.com/wp-content/uploads/2017/08/white-wine.jpg13332000Covert Engineers, Inc./wp-content/uploads/2017/07/cei-logo-tm.pngCovert Engineers, Inc.2017-08-09 17:08:162022-08-18 17:47:59White Wine Energy and Utilities
Whey Process Expansion
Dairy [200+], Mechanical [30+], Retrofit Projects [400+]No Sample Projects Available:
Bakery & Snack Foods [50+], Confectionary [10+], Eggs [<10], Food Ingredients [<10], Honey [<10], Nutraceutical [10+], Other [300+], Preserves, Jams, & Sauces [20+], Slaughterhouse Boning & Butchery [<10]Fully Automated Canning Line
Canning, Retort, UHT & Aseptic [10+], Mechanical [30+], Retrofit Projects [400+]Greenfield Potato Processing Plant
Fruit & Vegetables [400+], Greenfield Facilities [80+], Mechanical [30+], Refrigeration [70+]Seafood Facility SQF Renovation
Mechanical [30+], Retrofit Projects [400+], Seafood [40+]Jerky Processor
Meats & Poultry [20+], Mechanical [30+], Retrofit Projects [400+]Extended Shelf Life Milk Filler
Dairy [200+], Mechanical [30+], Retrofit Projects [400+]Brew House and Boiler Room
Ice, Drink & Beverage [70+], Mechanical [30+], Retrofit Projects [400+]Dairy Pilot Plant
Dairy [200+], Greenfield Facilities [80+], Mechanical [30+], Refrigeration [70+]White Wine Energy and Utilities
Energy [30+], Greenfield Facilities [80+], Ice, Drink & Beverage [70+], Mechanical [30+], Refrigeration [70+]