CEITM provided process and utility engineering services for the analysis, design, and specification of equipment necessary for the installation of a New 92BBL Cast Out Brew House. This project required a full set of block flow/mass balance…
A Distillery decided to move their existing distillation operation to a new location in Portland, OR while also expanding capacity by adding a new whisky still and brewhouse system. CEITM was engaged by a design-build contractor to provide…
https://covertengineers.com/wp-content/uploads/2017/07/spirits-project.jpg21002100Covert Engineers, Inc./wp-content/uploads/2017/07/cei-logo-tm.pngCovert Engineers, Inc.2017-08-09 17:04:052019-06-12 21:36:37Stillhouse Expansion, Energy and Utilities
CEITM provided engineering services for the design and installation of a Co-Gen Heat Recovery System from a Bio-gas digester. CEITM also developed the project plan and project schedule to meet project objectives of performance, within budget…
https://covertengineers.com/wp-content/uploads/2017/07/heat-recovery1.jpg15752100Covert Engineers, Inc./wp-content/uploads/2017/07/cei-logo-tm.pngCovert Engineers, Inc.2017-07-13 04:05:512019-06-12 21:36:54Vegetable Process Combined Heat & Power (CHP) / COGEN
Greenfield Brewery
Greenfield Facilities [80+], Ice, Drink & Beverage [70+], Mechanical [30+], Refrigeration [70+]Stillhouse Expansion, Energy and Utilities
Brownfield Facilities [50+], Energy [30+], Ice, Drink & Beverage [70+], Mechanical [30+], Refrigeration [70+]Vegetable Process Combined Heat & Power (CHP) / COGEN
Energy [30+], Fruit & Vegetables [400+], Mechanical [30+], Retrofit Projects [400+]