A national juice and dairy processor commissioned CEITM to develop a central ammonia refrigeration system performance design for a new cold storage facility (+34 ºF) and future freezer (-10 ºF). The challenge in this project was that the client…
https://covertengineers.com/wp-content/uploads/2019/10/refrigeration-system.jpg6831024Carter/wp-content/uploads/2017/07/cei-logo-tm.pngCarter2019-10-11 21:16:552022-08-18 17:47:58Refrigeration System Design
CEITM was contracted by a large international vegetable processor to provide complete engineering services including design, procurement, project management, installation oversight and startup/commissioning services for a new Crinkle Cut French…
https://covertengineers.com/wp-content/uploads/2019/10/crinkle-cut-fries.jpg508800Carter/wp-content/uploads/2017/07/cei-logo-tm.pngCarter2019-10-11 21:13:592022-08-18 17:47:58Crinkle Cut French Fries (3D Design)
CEITM was contracted by an Oregon fruit processor to develop general arrangement/layout drawings for five existing process lines (food service, aseptic, canning, compote, and FIH) to be relocated to a newly purchased existing facility.
The…
Covert Engineers, Inc. was hired by a design-build contractor to provide the utility and process design for a new, brownfield distillery project in Portland, OR including milling, mashing, fermenting, stills, tank storage, blending, maturation…
An international food processing company observed corrosion of their aging High-Pressure Liquid ammonia piping on a long run from the engine room to the processing plant so CEITM was hired to perform an engineering analysis and calculations…
CEITM was hired by a freezer construction contractor to provide engineering services in support of a new cold storage building being built in Washington State. CEI’s scope of work included design details for the under-slab glycol heating system…
CEITM was commissioned by an international food processing company to investigate the possibility of expanding an existing facility, within the property line boundary, to maximize production on an available site. A conceptual engineering design…
CEITM was commissioned to provide the process area HVAC design for a new barley malting facility in Montana as part of a partner design team residing in Western Canada. Preliminary and final mechanical design was developed for all required HVAC…
A large international food processing company received packaged cheese products from a small dairy processor in Nevada and claimed that the product was contaminated with foreign material in the form of small pieces of plastic during production.…
https://covertengineers.com/wp-content/uploads/2019/06/1366-MEKH-1.jpg15972000Covert Engineers, Inc./wp-content/uploads/2017/07/cei-logo-tm.pngCovert Engineers, Inc.2019-06-12 19:10:542022-08-18 17:47:59Foreign Material Investigation
CEITM was initially commissioned in 2017 to provide expedited final design and startup of a portion of a new chicory root processing line in Gering, Nebraska. The initial effort was a very fast paced emergency engineering effort to provide process…
Refrigeration System Design
Dairy [200+], Greenfield Facilities [80+], Ice, Drink & Beverage [70+], Refrigeration [70+]Crinkle Cut French Fries (3D Design)
Fruit & Vegetables [400+], Mechanical [30+], Retrofit Projects [400+]Fruit Processing Facility Relocation
Fruit & Vegetables [400+], Mechanical [30+], Retrofit Projects [400+]Greenfield Distillery
Greenfield Facilities [80+], Ice, Drink & Beverage [70+], Mechanical [30+], Refrigeration [70+]Ammonia Piping Failure Analysis
Fruit & Vegetables [400+], Refrigeration [70+], Retrofit Projects [400+]Cold Storage Underfloor Heating
Greenfield Facilities [80+], Refrigeration [70+]Site Master Planning
Greenfield Facilities [80+], Meals, RTE, Recipe [70+], Mechanical [30+]Barley Malting
Cereal Grains & Nuts [30+], Greenfield Facilities [80+], Mechanical [30+]Foreign Material Investigation
Dairy [200+], Retrofit Projects [400+]Chicory Processing
Fruit & Vegetables [400+], Mechanical [30+], Retrofit Projects [400+]